Class 8 Fire rated walls
A practical discussion of some cases in this class of building, and an insight into some of the issues to achieve compliance in the separating fire rated wall, from design and system selection
BCA Table C2.2 and maximum size of fire compartment – deemed to satisfy
Performance solutions
Design considerations and getting a team together
Various system options for Dts or as evidence for suitability or performance solutions
Buildability issues and satisfying deflection requirements
Spray options for the steel
Some fire engineered cases
Board options for the purlins at lower FRL’s, also Hebel and Speedpanel
Fire separation walls Class 6 warehouse
Large fire doors as an alternative
Watch the replay here
Fire engineers, building certifiers, passive fire inspectors/certifiers, builders and plastering contractors.